Technical Report on Hydro-electric Power Development in the Namibian section of the Okavango River Basin. The permanent Okavango River Basin Water Commission

This report describes an environmental impact assessment of the Hydro Power development in the Namibian sector of the Okavango River Basin, which includes a cost benefit analyse of the Hydro Power development in the region.

CHRISTIAN, C. (2009): Technical Report on Hydro-electric Power Development in the Namibian section of the Okavango River Basin. The permanent Okavango River Basin Water Commission. Maun, Botswana: The Permanent Okarango River Basin Water Commission (OKAKOM) URL [Accessed: 06.11.2011]