![](/sites/default/files/reference_icons/CHRISTIAN%202009%20Technical%20report%20on%20hydro%20electric%20power%20development.jpg)
This report describes an environmental impact assessment of the Hydro Power development in the Namibian sector of the Okavango River Basin, which includes a cost benefit analyse of the Hydro Power development in the region.
CHRISTIAN, C. (2009): Technical Report on Hydro-electric Power Development in the Namibian section of the Okavango River Basin. The permanent Okavango River Basin Water Commission. Maun, Botswana: The Permanent Okarango River Basin Water Commission (OKAKOM) URL [Accessed: 06.11.2011]