Palestinian experience with enhanced pre-treatment of black wastewater from Birzeit University using a UASB septic tank system

This study demonstrates the successful implementation of a UASB (Anaerobic upflow sludge blanket) as a pre-treatment for black- and domestic wastewaters at pilot (400L) and full scale. Organic pollutants were removed quite efficiently due to biological and physical processes (sedimentation and microbial degradation), facilitating a natural post- treatment (waste stabilization ponds).

AL-JUAIDY, A. ; MIMI, Z. ; AL-SA'ED. R. (2003): Palestinian experience with enhanced pre-treatment of black wastewater from Birzeit University using a UASB septic tank system. In: Proceedings of the 2nd international symposium E: Volume 2 , 563-566.